Hydrogen production hub — active contractor workforce

Contractor accommodation near Stanlow Refinery and EET Hydrogen

The Stanlow Manufacturing Complex in Ellesmere Port is the hydrogen production heart of the HyNet cluster. NokiStays provides fully furnished, all-inclusive contractor accommodation in Chester and Cheshire West — 20 to 25 minutes from Stanlow via the M53.

2
H₂ production plants at Stanlow
1GW
Low-carbon hydrogen output capacity
20–25
Minutes from NokiStays Chester
Enka
Main contractor — EET Hydrogen plant
The project

Stanlow, EET Hydrogen and the HyNet industrial cluster

Stanlow is one of the UK’s most significant industrial sites — a 900-acre refinery complex that has been central to the UK’s energy infrastructure for nearly a century. Under HyNet, it is being transformed into the hydrogen production hub for the North West.

EET Hydrogen, the clean energy division of Essar, is building two low-carbon hydrogen production plants at the Stanlow Manufacturing Complex. The plants will use an autothermal reforming (ATR) process to convert natural gas and refinery fuel gas into hydrogen. The CO2 produced during the reforming process will be captured and fed into the HyNet main onshore pipeline for permanent offshore storage in Liverpool Bay.

Main contractor for the EET Hydrogen build at Stanlow is Enka. The two plants combined are designed to produce up to 1GW of low-carbon hydrogen — enough to supply a significant portion of Cadent’s new 100km hydrogen distribution pipeline network, which will supply hydrogen to heavy industry, transport and power generation across the region.

Stanlow sits at the junction of several major HyNet infrastructure elements: the EET Hydrogen production plants, the Protos Energy Park at Ince Marshes (immediately adjacent), and the HyNet CO2 pipeline corridor running from the site toward Liverpool Bay. Workers on any of these projects — plus the ongoing Stanlow refinery maintenance and upgrade programme — all generate consistent, high-volume accommodation demand in the Ellesmere Port and Chester corridor.

The Manchester Ship Canal runs along the northern edge of the Stanlow site. Chester is 20 to 25 minutes south-east via the M53 motorway — the most practical and well-connected base for contractors working across the entire Ellesmere Port industrial zone.

670530a469e8cb000f66efef 36932885 1467256718

CQLCP — Project Data

Essar / EET Hydrogen — Ellesmere Port

  • Site Stanlow Manufacturing Complex, CH65 4HB
  • Owner / operator Essar Oil UK / EET Hydrogen
  • Main contractor Enka
  • Process technology Autothermal Reforming (ATR)
  • Production plants 2 units at Stanlow
  • H₂ output capacity Up to 1GW low-carbon H₂
  • CO₂ capture route HyNet pipeline → Liverpool Bay
  • H₂ distribution Cadent 100km pipeline network
  • HyNet cluster role Primary H₂ production hub
  • Adjacent site Protos Energy Park, Ince Marshes
  • Drive from Chester 20–25 min via M53
How Stanlow fits into HyNet — the hydrogen and CO₂ chain

Natural gas input

Refinery fuel gas from Stanlow operations

EET Hydrogen plant

ATR process — Stanlow, Ellesmere Port

H₂ to Cadent grid

100km hydrogen pipeline network

CO₂ offshore storage

Liverpool Bay — depleted gas fields

CO₂ captured at the Stanlow ATR plants is fed into the HyNet main onshore pipeline (United Infrastructure / LBCCS) and transported to Liverpool Bay for permanent storage. This pipeline runs through the Deeside and Flintshire corridor — and workers on the pipeline project also need accommodation in the Chester area.

Getting to site

Stanlow from your NokiStays base

Chester is 20 to 25 minutes from the Stanlow Manufacturing Complex via the M53 motorway — one of the shortest commutes in the HyNet corridor.

Via M53 (main route)

20–25 min

Chester to junction 9 of the M53, then direct into the Ellesmere Port / Stanlow industrial zone. Fastest and most consistent route under normal conditions.
Chester → M53 northbound
Exit junction 9 (Ellesmere Port)
Stanlow Manufacturing Complex — CH65 4HB

Via A41 (alternative)

25–30 min

A41 through Mollington and Backford toward Ellesmere Port. Useful during M53 peak-time congestion, particularly on Monday and Friday mornings.
Chester → A41 northbound
Through Mollington and Backford
Into Ellesmere Port south — CH65

By train

~20 min

Chester to Ellesmere Port station via the Merseyrail Wirral line. The station is close to the Stanlow site entrance — practical for workers without a vehicle on site.
Chester station → Merseyrail Wirral line
Ellesmere Port station (~20 min)
Short walk or taxi to Stanlow

Site reference

CH65 4HB

Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB. The Protos Energy Park (Kanadevia Inova) is immediately adjacent — workers covering both sites have the same commute.
What’s included

Every NokiStays Stanlow property includes

One fixed weekly or monthly rate. Everything below included — electricity, gas, water, broadband, parking and council tax. No extras. Invoice billing for Enka, EET Hydrogen and the full Essar supply chain.

Full furnishing throughout

Fully equipped kitchen

Free high-speed Wi-Fi — 24/7

Dedicated off-road parking

EV charging — selected properties

In-unit washing machine

Bed linen and towels provided

Smart TV

Electricity and gas

Water and broadband

Council tax included

8AM–10PM support, 7 days

Maintenance and inspection

1 to 7 nights
Planned shutdown visits, equipment inspections, site surveys and short-notice callouts to Stanlow. Book with 24 hours notice.

Construction phase stays

1 to 8 weeks
ATR plant installation, commissioning and mechanical completion phases. Rolling weekly terms, easy extension.

Long-term team stays

2 months or longer
Multi-year contracts covering both EET Hydrogen plants and the adjacent Protos site. Group bookings for 4 to 16+ people with invoice billing.
Supply chain reference

Main contractors at Stanlow

For procurement leads booking accommodation for Enka, EET Hydrogen, Essar or the wider Stanlow supply chain.
Owner / operator
Stanlow Manufacturing Complex operator
EET Hydrogen division
Clean energy arm of Essar — H₂ plant developer
Main contractor

Enka

EET Hydrogen production plants — Stanlow
Adjacent site

Kanadevia Inova

Protos Energy Park — Ince Marshes
HyNet pipeline

United Infrastructure

Main CO₂ onshore pipeline — LBCCS
Invoice billing is available for Enka, EET Hydrogen and all Stanlow supply chain companies. VAT receipts provided. Contact us to set up a company account covering your team’s stay duration.
Common questions

Frequently asked questions — Stanlow

Who is the main contractor at Stanlow for HyNet?
Enka is the main contractor for the EET Hydrogen production plants at Stanlow. The wider Stanlow Manufacturing Complex is operated by Essar Oil UK, and EET Hydrogen — the clean energy division of Essar — is the developer of the hydrogen plants. The adjacent Protos Energy Park is being built by Kanadevia Inova for site owner Encyclis.
Chester is approximately 20 to 25 minutes from the Stanlow Manufacturing Complex in Ellesmere Port via the M53 motorway (junction 9). The Protos Energy Park is immediately adjacent to Stanlow — workers covering both sites have the same commute. The Stanlow site postcode is CH65 4HB.
EET Hydrogen is building two low-carbon hydrogen production plants at the Stanlow Manufacturing Complex using an autothermal reforming (ATR) process. The plants will convert natural gas and refinery fuel gas into low-carbon hydrogen. The CO2 produced during the process is captured and transported via the HyNet pipeline for permanent offshore storage in Liverpool Bay. The hydrogen is distributed across the region via Cadent’s new hydrogen pipeline network.
Yes. The Protos Energy Park at Ince Marshes is immediately adjacent to the Stanlow Manufacturing Complex — both sites share effectively the same commute from Chester. NokiStays Chester properties are 20 to 25 minutes from both sites via the M53. If you are working across both Stanlow and Protos, Chester is the most practical single base.
Yes. NokiStays handles group bookings for teams of 4 to 16 or more. We arrange multiple properties near each other, manage phased arrivals and departures and provide consolidated invoice billing on company purchase orders. Contact us with your team size, site location and expected timeline for a proposal within 24 hours.
Chester gives access to all eight HyNet project sites. Stanlow and Protos are 20 to 25 minutes via M53. Deeside Industrial Estate and Connah’s Quay are 20 to 30 minutes via A548. Padeswood CCS is 25 to 35 minutes via A55. Runcorn is 35 to 40 minutes via M56. Point of Ayr at Talacre is 45 to 55 minutes via A55. Workers whose projects span multiple HyNet sites consistently use Chester as their central base.

Working on the Stanlow or EET Hydrogen project?

Tell us your site, team size and start date. We’ll have a proposal with properties, pricing and drive times back to you within 24 hours.

Mobile

07397 903494

Email

bookings@nokistays.co.uk

Search

November 2026

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30

December 2026

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
Size
Price
Amenities