Active build — workforce doubling end 2026

Contractor accommodation near Padeswood Cement Works

Heidelberg Materials’ CCS project at Padeswood is the UK’s most active HyNet build site right now. NokiStays has fully furnished, all-inclusive accommodation 25 to 35 minutes from the site — ready for solo workers and project teams alike.

80→160+

Workers on site — now to end 2026

2029

Operational target — multi-year build

25–35

Minutes from NokiStays Chester

800k

Tonnes of CO₂ captured per year
The project

What's being built at Padeswood

The Padeswood CCS project is a landmark in industrial decarbonisation — the world’s first carbon capture facility at a cement works, and the UK’s most advanced HyNet site currently in active construction.

Heidelberg Materials UK reached Final Investment Decision (FID) with the UK Government in September 2025 for a carbon capture and storage facility that will eliminate almost all emissions from the Padeswood Cement Works in Hope, Flintshire. The facility is being delivered under an EPCM contract by Worley and Mitsubishi Heavy Industries.

Groundworks started immediately after FID. By mid-2026 the site has seen over 60,000 tonnes of aggregate laid, more than 600 concrete piles installed, overhead powerlines diverted and 25,000 tonnes of topsoil removed and stockpiled. Around 80 construction workers are on site daily — and that figure is expected to double by the end of 2026 as the structural phase of the build ramps up.

The facility will capture around 800,000 tonnes of CO2 per year — approximately 95% of the cement works’ total emissions. The CO2 is then piped via the HyNet onshore pipeline to Liverpool Bay for permanent offshore storage. When operational in 2029, Padeswood will become the first cement plant in the world capable of fully decarbonised production, enabling Heidelberg Materials to produce evoZero net-zero cement at commercial scale.

Chester (1)

Padeswood CCS — Project Data

Heidelberg Materials UK

  • Site address Hope, Flintshire, CH7 4JX
  • Client Heidelberg Materials UK
  • EPCM contractor Worley / MHI
  • Tech provider Mitsubishi Heavy Industries
  • HyNet cluster Track 1 — CCUS approved
  • CO₂ capture capacity 800,000 t/yr
  • Capture rate ~95% of emissions
  • Construction jobs Up to 500
  • Permanent new jobs ~50
  • FID date September 2025
  • Operational target 2029
Construction workforce at Padeswood
Now — mid 2026
~80 workers/day 80%
End of 2026
160+ workers/day 100%
Workforce expected to continue growing into 2027–28 as mechanical and process plant installation phases begin. Peak project accommodation demand is approaching.

Sept 2025

Final Investment Decision (FID)

UK Government funding agreement signed. Heidelberg Materials and UK Government confirm CCS funding. EPCM contract awarded to Worley / MHI.

Dec 2025 — mid 2026

Groundworks and enabling works

Foundations, piling, powerline diversion, topsoil removal. 80 workers on site per day. Retaining wall construction under way.
Getting to site

Padeswood from your NokiStays base

The Padeswood site is in Hope, Flintshire — 25 to 35 minutes from Chester via the A55 or A494. Here are the main routes.

Via A55 (recommended)

25–30 min

Most direct route from Chester city centre. Fast dual carriageway westbound from Chester to junction 33, then A5104 into Hope.

Chester → A55 westbound
Exit junction 33 (Broughton)
A5104 south toward Hope
Padeswood site — CH7 4JX

Via A494 (alternative)

30–35 min

Useful when A55 is congested at peak hours. Runs through Queensferry and Buckley. Slightly longer but often more consistent journey time.
Chester → A494 northbound
Through Queensferry and Buckley
B5125 south to Hope area
Padeswood site — CH7 4JX

By train and taxi

~40 min

Chester to Buckley station (Borderlands Line via Wrexham). Buckley is approximately 2.5 miles from the Padeswood site — short taxi from station.
Chester station → Borderlands Line
Buckley station (~25 min)
Taxi to Padeswood (~8 min)

Site postcode and reference

CH7 4JX

Padeswood Cement Works, Hope, Flintshire, CH7 4JX. The site entrance is on Mold Road. Site-specific gate access is managed by Heidelberg Materials / Worley site management.
Why Chester?

Chester vs. staying local to Padeswood

Hope and the immediate Flintshire area have very limited contractor accommodation options. Chester gives you a 25-minute commute alongside a far better living environment for a long project stay.
Hope / Padeswood area
Flintshire — immediate vicinity
Chester — NokiStays
25–35 min commute to Padeswood
Local hotels
Holiday Inn, Premier Inn nearby
What’s included

Every NokiStays Padeswood property includes

All-inclusive means all-inclusive. One fixed weekly or monthly rate covers everything below — no extras, no surprises on the bill.

Full furnishing throughout

Fully equipped kitchen

Free high-speed Wi-Fi — 24/7

Dedicated off-road parking

EV charging — selected properties

In-unit washing machine

In-unit washing machine

Bed linen and towels provided

Electricity and gas

Water and broadband

Council tax included

8AM–10PM support, 7 days

Short stays

1 to 7 nights
Inspection visits, FEED reviews, site surveys, short-notice callouts. Book with as little as 24 hours notice.

Project stays

1 to 8 weeks
Groundworks phases, commissioning visits, equipment installation. Rolling weekly terms with easy extension.

Full build stays

2 months to 3 years
The Padeswood build runs to 2029. We can accommodate individuals and teams for the entire construction duration.
Supply chain reference

Main contractor and project team

For procurement managers and project coordinators booking accommodation for supply chain teams at Padeswood.
Client / owner
HyNet Track 1 CCUS — FID Sept 2025
EPCM contractor

Worley

Engineering, Procurement & Construction Management
Technology contractor
Advanced KM CDR Process™ — carbon capture tech
HyNet pipeline

Liverpool Bay CCS

United Infrastructure — main onshore pipeline

NokiStays provides invoice billing on company purchase orders — suitable for Worley, MHI and all Padeswood supply chain companies. VAT receipts available on request. Contact us to set up a company account for your team’s duration on site.

Common questions

Frequently asked questions — Padeswood

How far is Chester from the Padeswood cement works?
Chester is approximately 25 to 35 minutes from the Padeswood Cement Works in Hope, Flintshire. The most direct route is via the A55 westbound to junction 33, then the A5104 south into Hope. The site postcode is CH7 4JX.
The EPCM contract at Padeswood was awarded to Worley and Mitsubishi Heavy Industries (MHI). Worley leads the engineering, procurement and construction management. MHI provides its proprietary Advanced KM CDR Process carbon capture technology. Heidelberg Materials UK is the site owner and client.
Around 80 construction workers are on site daily right now. That number is expected to double to 160 or more by the end of 2026 as the structural and process plant phases begin. The Padeswood facility is scheduled to be operational in 2029 — making this a three-year build from groundworks through to commissioning.

Very little. Hope is a small village with almost no contractor accommodation options. Chester, 25 to 35 minutes away via the A55, provides far better quality furnished lets with parking, kitchens, laundry and all bills included. For a project build running until 2029, the quality of life difference over a long stay is significant.

Yes. NokiStays handles group bookings for teams of 4 to 16 or more. We can arrange multiple properties near each other, coordinate phased arrivals and manage the accommodation as your team size changes through different project phases. Invoice billing is available for Worley and Heidelberg Materials supply chain companies.
Padeswood is one of the capture sites in the HyNet North West cluster — a UK Government-backed carbon capture, hydrogen and CO2 storage project spanning North Wales and Cheshire. The CO2 captured at Padeswood will be piped via the HyNet main onshore pipeline (delivered by United Infrastructure) to Liverpool Bay for permanent offshore storage in depleted gas fields.

Working on the Padeswood project? Let's sort your accommodation.

Workforce is growing fast and the build runs to 2029. Tell us your team size, start date and how long you need — we’ll have a proposal back within 24 hours.

Mobile

07397 903494

Email

bookings@nokistays.co.uk

Search

November 2026

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30

December 2026

  • M
  • T
  • W
  • T
  • F
  • S
  • S
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
Size
Price
Amenities